This is an opportunity to acquire a majority stake in two RTB photovoltaic projects based in Romania, totaling 15 MW. The companies have an estimated EBITDA of 2.3m Euros and an estimated EBITDA margin of 88% for 2015.

General information about the project:
• Project location: Vrancea County, Carligele village, 5 kilometers from Focsani. The 15 MW project is split in two parks of 8 MW and 7 MW of installed capacity respectively. The projects are located next to each other, have similar permits and permissions, similar connection conditions and have been developed simultaneously.
• Both parks are connected into the same power station, very close to the photovoltaic structure. The 20 kV Focsani West power station is newly modernized (2013) and has 2 connection points, one for each park. The connection costs are very low – less than 90.000 € / park.
• The energy will be delivered directly into Transelectrica new substation (put in function last year) and will be consumed directly by industrial consumers and households from the city of Focsani. There is NO RISK of delivery interruptions.
• NO network reinforcement are requested.
• Land: 31 hectares – concession contracts for 25 years, with the local authorities – Carligele Village local council, the owner of the land.
• GIS coordinates: 45.68: Northern Latitude, 27.13 Eastern Longitude.